|
Recipe: Hook: TMC 200R Thread: UTC 70, color to match body Body: Stretch Tubbing, large
|
Step 1.
Put the hook in the vise.
|
|
Step 2.
Slide the tubbing from the front. It might feel a little tight, but it will slide, just be patient.
|
|
Step 3.
Once it's on, you might have a liitle hanging of the front. Cut it to length and don't let it go past the bend.
|
|
Step 4.
Start the thread at the back behind the tubbing. Create a little thread dam.
|
|
Step 5.
Use the thread for ribs and make them evenly spaced.
|
|
Step 6.
Whip finish and glue it.
|
|
|